Major construction on the expressway--shown here in this photo beyond the 35th Street overpass--was completed in October 2007. However, according to the online work Building the Cook County Expressway System by transportation historian Andy Plummer, motorists did not adapt as quickly to the initial eastbound (southbound) split for the express and local lanes at 26th Street, just before the merge from the Franklin Street Connector (which did not open until 1964). This 2005 photo shows the westbound / northbound Dan Ryan Expressway (I-90 and I-94) approaching the "Circle" interchange with I-290 (Eisenhower Expressway). Prior to the start of construction, a coalition of minority groups threatened to shut down the project unless each minority group was given a greater share of the contracts. Most of the expressway is signed dually as I-90 and I-94, though the southern / eastern end of the expressway initially was designated as I-90, while the I-94 designation shifted to the Chicago Skyway. And we are dedicated to elevating our communities through. Conditions for lawn mowing are great. Traffic Chicago: 2 hurt in crash on Dan Ryan Expressway ramp to Bishop The driver of the first car and the front seat passenger of the second car were hospitalized with life threatening injuries. All lanes remained closed as of the afternoon Saturday. The risk of grass pollen symptoms is low. Four miles of continuous high-rise housing projects (Stateway Gardens and the Robert Taylor Homes) formerly ran parallel to the expressway on its eastern side from Cermak Road south to Garfield Boulevard. Soon thereafter, the state erected a 48-foot-wide overhead sign reminding motorists to "STAY IN YOUR LANE," which rectified the problem for more than a decade until additional signing changes were made. As sections of the expressway opened, the "south" name was dropped soon thereafter. ISP District Chicago Troopers responded to a four-vehicle crash at Interstate 94 southbound at the Interstate 57 split near State Street at about 4 p.m. CHICAGO (WLS) -- A fiery truck became engulfed in flames after hitting a car and a wall and killing at least one person, Illinois State Police said. Lin International Wins Prestigious American Council of Engineering Companies Awards for Dan Ryan Red Line Track Renewal Project and Wacker Drive and Congress Parkway Reconstruction. Further details were not immediately available. Police have not provided further information about the crash. (Photo by Cook County Board of Commissioners.). Dan Ryan Expressway - Wikipedia This data is no older than 10 minutes old. Stay out of the water if there is a chance of lightning. Updated: Apr 14, 2023 / 05:43 PM CDT. Get browser notifications for breaking news, live events, and exclusive reporting. our creativity, multidisciplinary capabilities, and commitment to diversity, equity and inclusion. construction / Check back with ABC7 for updates. - Reconstruction of eight northbound and southbound mainline lanes, - Addition of a northbound and southbound auxiliary lane, - Reconstruction of connecting ramps to frontage roads for improved geometrics, - A new highway drainage collector system, - A new, custom-designed high-mast lighting system and signage, - Removal or rehabilitation of retaining walls, - Advanced installation of 27 separate storm sewer laterals, from 21 inches to 48 inches in diameter, - Construction of 6,300 feet of water main and 2,500 feet of combined sanitary/storm sewer relocation, - Protection slabs for existing water mains and sewers in proximity to the final pavement surface, - Project coordination with multiple design consultants.